From the Earth First! Newswire
Unprecedented “dump platforms” protected by intricate 100 ft perimeter web of safety lines to protect sitters; action declared in solidarity with “Idle No More” in Canada

From a TSB statement released at 9:00AM this morning — Late last night, blockaders set up two “dump platforms” in trees outside of Diboll, Texas which would otherwise be cleared to make way for TransCanada’s Keystone XL toxic tar sands pipeline. These special “dump platforms” are shielded by an unprecedented 80-100 ft perimeter of life-lines arranged, which if disturbed would certainly dump the two blockaders nested in them roughly 50-60 ft in the air. The Blockaders are sitting in solidarity with the now global “Idle No More” campaign for First Nation’s human rights and tribal sovereignty that very recently started in Canada.

This new tree blockade comes just a couple weeks after the end of Tar Sands Blockade’s 85-day tree-sit near Winnsboro, TX. TransCanada rerouted the tar sands pipeline to go around the Winnsboro tree-sit, despite having told countless landowners, including Douglass resident Mike Bishop, that the route was set in stone and could not be altered to avoid bulldozing their cropland, or to go around schools, neighborhoods, or ecologically sensitive areas.

This new site is surrounded by barriers like Highway 59, railroad tracks, and Ryan Lake. With these nearby, blockaders have found a location around which the pipe cannot easily be rerouted.

Update from TarSands Blockade:

6:30 pm – Cherry picker reached platform, Audrey evicted and under arrest; Mike still holding strong.

More Updates